30.27 Choosing SSE, FIM, or both
FIM and SSE occupy complementary positions. FIM is fast enough to screen many sample sizes, schedules, allocations, and effect scenarios. SSE runs the actual simulation–fit–test pipeline and reveals finite-sample failures, bias, covariance problems, and Monte Carlo uncertainty. A strong workflow narrows the design space with FIM and validates finalists with SSE.
Concepts to keep separate
- Use reduced FIM as the default covariate-effect screen, with step and approximation sensitivity checks.
- Use SSE when BLQ, compliance, complex dropout, estimator failures, boundaries, or method-specific decisions matter.
- When both are run, align truth, N, allocation, schedule, attrition, hypothesis, alpha, and test as closely as support permits.
- A discrepancy is diagnostic evidence. Investigate assumptions rather than averaging results.
Terminology matters because a single scenario can contain several denominators and several sources of randomness. Truth is the parameter vector used to generate a replicate. Estimate is the value recovered from that replicate. Design is the planned arrangement of subjects, arms, doses, and observations. Method is the approximation or simulation–estimation procedure used to predict performance. A credible report labels all four.
Mathematical or operational walkthrough
The executed comparison demonstrates all three cautions: full FIM proposed N=9, reduced FIM N=44, and the 20-replicate SSE smoke run reported that the smallest tested N=40 already met target. Only the reduced FIM has a precise enough and suitably conservative interpretation for initial planning; production SSE is still required.
For novices, read every expression from the inside out: identify the scientific effect, identify the null value, put both on the same parameter scale, identify the variance or information that belongs to the actual design, and only then calculate a test statistic or sample size. Units and parameterisation should cancel in a way that leaves a dimensionless statistic.
How this maps to nlmx
External comparison with independently implemented software can validate formulas and identify definition differences, but agreement alone does not prove that the population model or trial assumptions are clinically correct.
Chapter 30 explains the statistical and implementation concepts. Chapter 31 gives the complete nlmx power command, every CLI and settings control, precedence, output schema, and production workflow. This separation is deliberate: choosing an option correctly requires understanding which estimand and assumption it changes.
Quality-control checklist
- Are compared engines solving the same design?
- Is SSE replication adequate?
- Are differences traced to implementation or approximation?
- Is the final recommendation conservative and feasible?
The graph is explanatory; the CSV, JSON, resolved settings, model inputs, and replicate rows are the authoritative evidence. When a plotted point looks surprising, diagnose the underlying rows before changing the design.
Common mistakes
- Choosing whichever method yields the smallest N
- Calling a smoke SSE run definitive
- Averaging incompatible sample-size estimates
Also avoid copying a sample size from a nearby project. Power is conditional on the model, tested effect, covariate distribution, schedule, residual and random variability, attrition, test, estimator, and success criteria. Similar-looking studies can have very different information.
Evidence to retain
- scientific question, estimand, hypothesis, alpha, target, and criteria;
- model/data/design inputs, parameter source and uncertainty distribution;
- software version, method, approximation, seed, threads, command, and resolved settings;
- scenario grid, row-level results, failures, denominators, intervals, diagnostics, and checksums;
- scripts that calculate derived tables and figures, plus the interpretation and limitations.
Navigation
See the previous page, next page, and formula and decision index.