Documentation

30.20 FO, FOCE, and FOCE-I information

FO, FOCE, and FOCE-I information

Nonlinear mixed-effects FIMs require a point around which subject predictions are linearised. nlmx FO evaluates at eta=0. FOCE and FOCE-I draw eta values from the random-effect distribution and average information over those draws; FOCE-I additionally evaluates residual variance at the drawn eta, retaining interaction. The chosen approximation changes both cost and the local moments.

Concepts to keep separate

  • FO is deterministic and fastest but may be weak for strongly nonlinear models or large variability.
  • FOCE averages nonlinear subject behavior over ETA draws while keeping residual variance at eta=0.
  • FOCE-I averages with residual variance evaluated at eta-star and can capture interaction between random effects and residual error.
  • The number and seed of draws affect Monte Carlo noise in FOCE/FOCE-I FIM results.

Terminology matters because a single scenario can contain several denominators and several sources of randomness. Truth is the parameter vector used to generate a replicate. Estimate is the value recovered from that replicate. Design is the planned arrangement of subjects, arms, doses, and observations. Method is the approximation or simulation–estimation procedure used to predict performance. A credible report labels all four.

Mathematical or operational walkthrough

When FO, FOCE, and FOCE-I yield similar target N and parameter precision, the inexpensive approximation may be adequate for screening. Large discrepancies reveal a nonlinear-design sensitivity that should be examined with SSE.

For novices, read every expression from the inside out: identify the scientific effect, identify the null value, put both on the same parameter scale, identify the variance or information that belongs to the actual design, and only then calculate a test statistic or sample size. Units and parameterisation should cancel in a way that leaves a dimensionless statistic.

How this maps to nlmx

Do not assume the FIM approximation name makes it numerically identical to a NONMEM estimation method with the same label. Cross-software equivalence requires matched definitions and validation.

Chapter 30 explains the statistical and implementation concepts. Chapter 31 gives the complete nlmx power command, every CLI and settings control, precedence, output schema, and production workflow. This separation is deliberate: choosing an option correctly requires understanding which estimand and assumption it changes.

Quality-control checklist

  • Is the approximation recorded?
  • Are enough ETA draws used for stable results?
  • Do repeated seeds change conclusions?
  • Was the final design checked with empirical estimation?

The graph is explanatory; the CSV, JSON, resolved settings, model inputs, and replicate rows are the authoritative evidence. When a plotted point looks surprising, diagnose the underlying rows before changing the design.

Common mistakes

  • Treating FOCE FIM as an actual FOCE fit
  • Using too few draws without sensitivity analysis
  • Claiming software equivalence from shared terminology

Also avoid copying a sample size from a nearby project. Power is conditional on the model, tested effect, covariate distribution, schedule, residual and random variability, attrition, test, estimator, and success criteria. Similar-looking studies can have very different information.

Evidence to retain

  • scientific question, estimand, hypothesis, alpha, target, and criteria;
  • model/data/design inputs, parameter source and uncertainty distribution;
  • software version, method, approximation, seed, threads, command, and resolved settings;
  • scenario grid, row-level results, failures, denominators, intervals, diagnostics, and checksums;
  • scripts that calculate derived tables and figures, plus the interpretation and limitations.

See the previous page, next page, and formula and decision index.