Documentation

14.7 Partial AUC and boundary interpolation

A partial AUC integrates concentration over a prespecified interval [a,b] relative to dose, such as AUC0–4 or AUC4–12. It is valuable when a clinically relevant window matters more than total exposure.

Observed, partial and infinite area regions

Boundaries between samples

If a or b falls between observations, concentration at that time is interpolated using the active segment rule. The segment is split at the boundary, and only the requested piece is integrated. This preserves additivity: AUC0–4 + AUC4–12 should equal AUC0–12 under identical conventions.

If b lies after Tlast, a partial area may be extrapolated with λz when allowed; otherwise it is blank. Extrapolated partial AUC should be labeled because it is no longer entirely observation-supported. A boundary before the profile start is invalid rather than silently inventing predose area.

Prespecification

Choose windows from clinical or design questions before inspecting group differences. Selecting a window that maximizes separation is exploratory and inflates false-positive interpretation. The time origin must be dose-relative and comparable across profiles.

Boundary audit example

Suppose samples occur at 2 and 6 hours but a partial interval ends at 4 hours. The method creates a concentration at 4 by the active interpolation rule, integrates only the 2-to-4 portion, and stops. It must not include the whole 2-to-6 segment or prorate an area without respecting curve shape. Save the interpolated value or enough inputs to reproduce it.

A boundary beyond observed support requires extrapolation, not interpolation. Even when configured, that portion depends on assumed terminal continuation and should be quantified separately.

Common mistakes

  • Using actual clock time for one profile and postdose time for another.
  • Treating interpolated endpoints as observed samples.
  • Omitting whether a partial area includes extrapolation.
  • Selecting windows after viewing outcomes without disclosure.

Checklist

  • Define a and b and their units prospectively.
  • Confirm profile coverage and time origin.
  • Verify interpolation matches the AUC method.
  • Test additivity of adjacent windows.
  • Flag/quantify extrapolated portions.

Further reading

See integration foundations, AUC∞, and the csvworked partial-area output.