14.0 Notation and formula index
This orientation page collects the main quantities. Later pages explain applicability, route-specific names, and safeguards; the table is not a substitute for those conditions.
| Quantity | Definition |
|---|---|
| C(t) | Concentration at time t after the dose. |
| Cmax, Tmax | Largest observed usable concentration and its first time. |
| Clast, Tlast | Last measurable concentration and time. |
| λz | Minus the fitted slope of ln C versus time in the terminal phase. |
| t½ | ln(2)/λz. |
| AUClast | Numerical integral of C(t) from the profile start to Tlast. |
| AUC∞ | AUClast + Clast/λz (observed or terminal-predicted Clast). |
| % extrapolated | 100 × (AUC∞ − AUClast)/AUC∞. |
| AUMC | Integral of t·C(t), the first moment of concentration. |
| MRT | AUMC/AUC, with infusion correction where applicable. |
| CL | Dose/AUC∞ for intravenous administration. |
| CL/F | Dose/AUC∞ for extravascular administration (apparent clearance). |
| Vz | Dose/(λz·AUC∞), intravenous terminal volume. |
| Vz/F | Apparent extravascular terminal volume. |
| Vss | CL·MRT for IV profiles. |
| AUCτ | Area over one dosing interval τ. |
| Cavg | AUCτ/τ. |
| fluctuation | 100(Cmax−Cmin)/Cavg. |
| swing | (Cmax−Cmin)/Cmin. |
| PTR | Cmax/Cmin. |
Units
If concentration is mass/volume and time is hours, AUC is mass·time/volume, AUMC is mass·time²/volume, λz is 1/time, and half-life/MRT are time. Dose divided by AUC has volume/time only after dose/concentration mass units are made consistent. Software labels do not perform conversion automatically.
Observed versus inferred
Cmax/Tmax/Clast/Tlast are observed summaries after data rules. AUClast is interpolated between observations. λz is regression-derived. AUC∞ and all dependent disposition parameters add extrapolation. Keep these evidence levels distinct in interpretation.
Common mistakes
- Dropping
/Ffrom extravascular clearance or volume. - Calling AUClast AUC∞.
- Treating Tmax as a fitted peak time.
- Combining incompatible mass units in clearance.
Checklist
- Define each abbreviation and unit in reports.
- Mark observed, integrated, regressed, and extrapolated quantities.
- Use route-appropriate parameter names.
- Trace missing upstream inputs into missing dependents.
Further reading
See parameter dependencies, clearance/volume, and units.