Documentation

14.0 Notation and formula index

This orientation page collects the main quantities. Later pages explain applicability, route-specific names, and safeguards; the table is not a substitute for those conditions.

Quantity Definition
C(t) Concentration at time t after the dose.
Cmax, Tmax Largest observed usable concentration and its first time.
Clast, Tlast Last measurable concentration and time.
λz Minus the fitted slope of ln C versus time in the terminal phase.
t½ ln(2)/λz.
AUClast Numerical integral of C(t) from the profile start to Tlast.
AUC∞ AUClast + Clast/λz (observed or terminal-predicted Clast).
% extrapolated 100 × (AUC∞ − AUClast)/AUC∞.
AUMC Integral of t·C(t), the first moment of concentration.
MRT AUMC/AUC, with infusion correction where applicable.
CL Dose/AUC∞ for intravenous administration.
CL/F Dose/AUC∞ for extravascular administration (apparent clearance).
Vz Dose/(λz·AUC∞), intravenous terminal volume.
Vz/F Apparent extravascular terminal volume.
Vss CL·MRT for IV profiles.
AUCτ Area over one dosing interval τ.
Cavg AUCτ/τ.
fluctuation 100(Cmax−Cmin)/Cavg.
swing (Cmax−Cmin)/Cmin.
PTR Cmax/Cmin.

Units

If concentration is mass/volume and time is hours, AUC is mass·time/volume, AUMC is mass·time²/volume, λz is 1/time, and half-life/MRT are time. Dose divided by AUC has volume/time only after dose/concentration mass units are made consistent. Software labels do not perform conversion automatically.

Observed versus inferred

Cmax/Tmax/Clast/Tlast are observed summaries after data rules. AUClast is interpolated between observations. λz is regression-derived. AUC∞ and all dependent disposition parameters add extrapolation. Keep these evidence levels distinct in interpretation.

Common mistakes

  • Dropping /F from extravascular clearance or volume.
  • Calling AUClast AUC∞.
  • Treating Tmax as a fitted peak time.
  • Combining incompatible mass units in clearance.

Checklist

  • Define each abbreviation and unit in reports.
  • Mark observed, integrated, regressed, and extrapolated quantities.
  • Use route-appropriate parameter names.
  • Trace missing upstream inputs into missing dependents.

Further reading

See parameter dependencies, clearance/volume, and units.