30.26 BLQ handling, sampling schedules, and allocation
Below-quantification-limit (BLQ) observations, sampling schedules, and treatment allocation determine where information exists. Early, peak, distribution, and terminal samples support different parameters. BLQ handling changes the likelihood contribution of low concentrations. Allocation trades precision across arms and contrasts. These design details often matter more than a modest increase in total N.
Concepts to keep separate
- In nlmx 4.14.3, LLOQ and BLQ action affect SSE but are not applied by the FIM, so the engines can describe different designs.
- Schedule comparisons should keep dose, population, and analysis assumptions constant unless the scenario explicitly changes them.
- Sparse designs need enough within- and between-subject support for random effects and covariate contrasts.
- Allocation weights must become feasible integer counts; very small categories or arms may need minimum-enrolment constraints.
Terminology matters because a single scenario can contain several denominators and several sources of randomness. Truth is the parameter vector used to generate a replicate. Estimate is the value recovered from that replicate. Design is the planned arrangement of subjects, arms, doses, and observations. Method is the approximation or simulation–estimation procedure used to predict performance. A credible report labels all four.
Mathematical or operational walkthrough
A terminal sample that is almost always BLQ may contribute less clearance information than its nominal time suggests. SSE with the planned BLQ likelihood is the appropriate final challenge after FIM screening.
For novices, read every expression from the inside out: identify the scientific effect, identify the null value, put both on the same parameter scale, identify the variance or information that belongs to the actual design, and only then calculate a test statistic or sample size. Units and parameterisation should cancel in a way that leaves a dimensionless statistic.
How this maps to nlmx
Plot expected profiles with sampling times and LLOQ, tabulate records per phase and arm, and inspect predicted BLQ fractions before interpreting a sample-size curve.
Chapter 30 explains the statistical and implementation concepts. Chapter 31 gives the complete nlmx power command, every CLI and settings control, precedence, output schema, and production workflow. This separation is deliberate: choosing an option correctly requires understanding which estimand and assumption it changes.
Quality-control checklist
- Are schedule times clinically feasible?
- Are expected BLQ fractions reported by time and arm?
- Does allocation support every planned contrast?
- Are engine-specific design differences disclosed?
The graph is explanatory; the CSV, JSON, resolved settings, model inputs, and replicate rows are the authoritative evidence. When a plotted point looks surprising, diagnose the underlying rows before changing the design.
Common mistakes
- Treating BLQ as observed zero
- Optimising times without clinic constraints
- Allowing an integer allocation to remove a critical arm
Also avoid copying a sample size from a nearby project. Power is conditional on the model, tested effect, covariate distribution, schedule, residual and random variability, attrition, test, estimator, and success criteria. Similar-looking studies can have very different information.
Evidence to retain
- scientific question, estimand, hypothesis, alpha, target, and criteria;
- model/data/design inputs, parameter source and uncertainty distribution;
- software version, method, approximation, seed, threads, command, and resolved settings;
- scenario grid, row-level results, failures, denominators, intervals, diagnostics, and checksums;
- scripts that calculate derived tables and figures, plus the interpretation and limitations.
Navigation
See the previous page, next page, and formula and decision index.